S Tubing Heads
Printable Version

The S tubing head is designed to be full opening even over 7-5/8” casing. The straight bowl and 45° load shoulder allows the use of one bowl design for virtually all applications. A variety of single and dual tubing hangers are available for a wide array of service conditions and operating preferences.

Multiple Completion Options
SD dual tubing heads are equipped with two MC (multi-completion) guide pins located 180° apart just above the 45° load shoulder. When landing the dual tubing hanger, the MC guide pins are run in to orient the tubing hanger segments.

Tubing Head Bottom Connections
Standard bottom preparations for tubing heads include single or double IP seals, SP or SP-H packoff bushings. For IP secondary seal configurations, the tubing head provides injection ports through which plastic can be injected to enhance the IP seal.

SP, SP-H, and Double IP Seals

 

© Seaboard International. All rights reserved.
Some photographs on this site were taken by Jack Richburg Photography.